29 Mar 2014

Simple roof flashing repair





Old roof, lead flashing and leaks are going to happen...its just a matter of time! But don't despair, you can easily repair! Its quick and relatively cheap to do yourself, so why not DIY? Let me show you how...


Here is everything you will need! I use a sealant which has a fibreglass component incorporated in it.

TIP buy disposable brushes from the $2 shop


Step 1

Remove all old and previous repair materials. Lift up the flashing to reveal the roof metal underneath. 

TIP You may need to put something under the corners to hold it up while working on it. In this case it was a lead flashing so it stayed bent up.


Step 2

Using a wire brush remove any loose rust as far as you can reach. Clean this loose rust up straight away as it can start new rust on the roof or in your gutter.

TIP I used a leaf blower to clean up the roof and gutters after this step.

Step 3

Paint the rust with a rust inhibitor such as Penetrol. using one that dries quickly is better as it allows a better fix if its sealed as soon as possible, and stops a rain shower from possibly interrupting or compromising the process. 

TIP Read the instructions when buying the product not on the roof!


Step 4

Using the same brush, apply narrow band of sealant to the perimeter of the rusted roof iron on the inside of the flashing. Make this a thicker rather than wider bead, as when you press the flashing back into place, it will spread under and out from under the flashing. This is important !


Step 5

Replace the flashing to its original position, and press down to allow the sealant to bulge out from under the edge of your flashing. 

TIP Fix the flashing down using either weights or short stainless steel tech screws to pull the flashing and roof together all around the perimeter of the treated area.
In this case the lead was gently tapped into shape to form closely to the roof profile...

Step 6

Apply a bead of sealant to the roof and top of the flashing while the sealant is still wet underneath to form one complete seal around the entire flashing.

 TIP It pays to seal the entire flashing and not just one area when doing this repair, as there will invariably be another weak area just waiting to leak!
Make sure that you work the sealant into the gaps ad crevices all around the edges so that water cannot form pools especially on the upper edge


This repair should be done on a fine warm day, well after the dew has evaporated and no rain is forecast for the best results. 
SAFETY...
Remember to be safe on a roof... NEVER work on a wet roof, ALWAYS tie onto a safely line, and walk where the roof fixings indicate support from below to avoid denting the roof iron.



3 Dec 2013

Grooming a tree


I LOVE climbing things...Trees, buildings, mountains! This is a job I did this week for a regular client who has a tree in his yard that needed thinning out. Problem is this tree is full of thorns! I used a ladder to get a safety line into the crown of the tree,  then got into the tree using a hand saw to clean the centre. Later I used a pole chainsaw to reach the outer branches from inside the tree. Then I chipped all the cut wood into bags and removed it from the site. I did not want to spoil the look of the tree just thin it out some...Before and after shows the thinner tree but the same character.




As part of the shared skills deal I have with a friend Dave, he designed the signage for my truck and I helped him with a couple of problem trees at his place. Here is the link to his blog where you can see me in removing a difficult dead tree...
...Dave is a great artist and graphic designer and an intrepid gardener too, check out his blog its a quality read!

Converting a storeroom


This client just bought a home and wanted to turn an old unused store room into a second study. The room has no windows or natural light and has several service pipes on one concrete wall. There was no insulation and being under the house was cold, not condusive to hours of study! It needed lining and something had to be done to hide the pipes on the wall and cover up the ceiling beams. I gave him a few ideas on how to finish it off and we reused an cabinet he had removed from his bedroom which I adapted to fit on the ledge and cover the pipes. Neat!



finished pics to come soon!

Crushed stone walkway


My client was putting her home up for sale but felt that the paved area outside one of the bedrooms was looking unfinished and wanted a pathway and surround added to finish it off.
This took me a day, but there was the small matter of getting a cubic meter of stones to the site...




I used a weed mat cloth to prevent the grass growing through the stones later ( In New Zealand everything grows like mad!) as I had no time to spray the grass with a weed killer. The ground was sloping so the path needed to be quite deep to het a decent flat finish, so this path used up 1. 5 tons of stone!  It was 13 m long.

Bedroom wardrobe


A regular client of mine asked me to build a wardrobe in the master bedroom of her home. ( not sure why a modern new home didn't have one!)  I have never done one of these before, so it took me about 6 hours to construct, the stud was 2.4m high and the sliding doors were only avaiable in 2.0 m high so I made the top are a storage area behind hardboard sliders. My client had some storage units she wanted to use inside so I didn't build any shelves just a hanging rail.




24 Nov 2013

Simple Planter box

Planter boxes are great ways to add color to a balcony, or grow veges in. They are cheap and simple to make. I have used decking timber leftovers from a job to construct this one. Here are the tools you will need to build this simple project. You could use hand tools as well but it will take a mite longer to complete.
 Step1
Cut 4 rails of equal length to suit your planter box sides, clamp and add wood glue to either end.
 Step 2
Clamp and screw on the precut legs to either end making them flush with the top on each side. Add a leg for extra support in the middle of the panel, if the planter's overall length is over a meter long.

 Step 3
Now do the same with the ends, remembering to leave a space as wide as the side rail's thickness  so that the corners are flush when joined to the side panels.
 Step 4
When you have both sides and ends prepared, screw them together on a flat, level surface so that the box is square and level
 Step 5
Now add a rail at the bottom of the last side rail on both the insides to take a floor plate.
 Step 6
Do the same for the ends and add a nog in the middle to keep the floor from sagging...

 Step 7 
Carefully cut the floor to fit the bottom. Hint! Place the plywood sheet on the bottom of the upturned box and temporarily fix it in place. Now trace the shape of the inside onto the plywood and remove from the box. Now add the floor support's width to the drawing, and cut out for a perfect fit!

Step 7
Your box should look like this! You can add some top finishing plates if you like, my client did not want these.

23 Nov 2013

A new landing

My clients on this job were an retired couple who's old landing was not only rotten but an eyesore! It was downright dangerous, almost falling apart, and had to be replaced completely as soon as possible. I had to remove the old structure first but took the time to measure up its dimensions to give me a plan to replace it as close as possible to the original style.


Next I dug two post holes 800mm deep and concreted in two 100 x 200mmm treated posts and left them for a couple of days to allow the concrete to set well. Since the building was to take place on the posts themselves I wanted them to be firmly set to avoid and separation from the concrete footings and cause 'wobbly legs'...

 Step cuts in the posts are made to give the supporting joist a firm fixture, and the joist is bolted to it.

 Next a faceplate is bolted through  the house floor joist (using packers,  a 20 mm space must be made between the house and the joist to prevent water retention and rot occurring) and bearers are fixed between the two to form the floor support. Then that is all clad with a cover plate to make it look tidy!
In the picture below,  I have nogged up below the floor for a storage area to be added

Now the floor is cut from a single sheet od 20mm treated plywood and fixed to the bearers, and the cladding is placed onto the structure, I have begun to frame up for the walls and roof of the covered cubicle. The storage floor is just visible.
 I have the basic placement for the windows and roof in place, and begin to add the cladding and windowsills to the structure

 Finally the roof sheeting in on.


 I decided to have a go at making the stairs myself to keep the budget within the client's retirement finances! I did some research on the web and found a useful angle calculator on my smart phone app to help calculate the dimensions for the stairs. Once the tread positions were marked I set the skill saw depth and made several cuts within the tread placement area and then using a chisel cleaned out the  rebate ( use a router if you have one, its much faster)
 After cutting all the tread rebates the treads are fitted and nailed in place.

 The handrail is attached and a gate made of leftovers to cover the storage area
Job done! It took me 3 1/2  days working on my own to complete,  and I used rough sawn treated timber which I dressed myself to build it with, which took more time, but vastly reduced the cost.